Image from Google Jackets

The Site Waste Management Plans Regulations 2008 [electronic resource]

By: Language: English Series: SI ; 2008: 314Publication details: London TSO 2008Subject(s): LOC classification:
  • 614.76 $2 18
Online resources: Summary: Come into force 6 April 2008. Require the preparation of a Site Waste Management Plan (SWMP) by any person intending to carry out a construction project with an estimated cost greater than £300 000. Explains the requirements for a SWMP, including how to update a SWMP for a project of £500 000 or less and a project worth more than £500 000. Also sets out additional duties of the principal contractor and the client.
Holdings
Item type Current library Call number Copy number Status Barcode
Book Virtual Online ONLINE PUBLICATION (Browse shelf(Opens below)) 1 Available 142573-2001

Come into force 6 April 2008. Require the preparation of a Site Waste Management Plan (SWMP) by any person intending to carry out a construction project with an estimated cost greater than £300 000. Explains the requirements for a SWMP, including how to update a SWMP for a project of £500 000 or less and a project worth more than £500 000. Also sets out additional duties of the principal contractor and the client.