Image from Google Jackets

Determination favours the contractor

By: Language: English Series: Building Trades Journal ; 192(5679) 30 October 1986 25-27(3)Publication details: 1986Subject(s): Summary: Discusses grounds for determination by both the employer and the contractor, noting the rights and duties of the parties. Includes table listing the grounds for determination under JCT 1980 , IFC 1984 and MW 1980 .
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS37051 (Browse shelf(Opens below)) 1 Available 1892-1001

Discusses grounds for determination by both the employer and the contractor, noting the rights and duties of the parties. Includes table listing the grounds for determination under JCT 1980 , IFC 1984 and MW 1980 .