Image from Google Jackets

Definition of prime cost of daywork carried out under a plumbing contract

By: Language: English Publication details: London BCIS 2010Description: 16p. 30cmISBN:
  • 9781907196034
Subject(s): LOC classification:
  • 692.8 $2 18
Partial contents:
Application -- Composition of total charges -- Labour: non-productive overtime -- Materials and goods -- Plant -- Incidental costs, overheads and profit; non-productive overtime -- Appendix A: model documentation for inclusion in a building contract -- Appendix B: example calculations of prime cost of labour in daywork
Summary: Operative from 1 May 2010, this definition provides a basis for the valuation of daywork executed under such contracts as provide for its use. It is not applicable in the case of daywork executed after the date of practical completion.
Holdings
Item type Current library Call number Copy number Status Barcode
Archive London RICS Boxes RICS 2010/26 (Browse shelf(Opens below)) 1 Available 30076908
Book London Reference copy P692.8 ROY (Browse shelf(Opens below)) 1 Available 30075435

Application -- Composition of total charges -- Labour: non-productive overtime -- Materials and goods -- Plant -- Incidental costs, overheads and profit; non-productive overtime -- Appendix A: model documentation for inclusion in a building contract -- Appendix B: example calculations of prime cost of labour in daywork

Operative from 1 May 2010, this definition provides a basis for the valuation of daywork executed under such contracts as provide for its use. It is not applicable in the case of daywork executed after the date of practical completion.