Image from Google Jackets

The question of nomination

By: Language: English Series: Chartered Quantity Surveyor ; 9 (9) April 1987, 25-26 (2)Publication details: 1987Subject(s): Summary: Reviews the system of nomination in building contracts, which is being challenged increasingly by clients. Notes the views of the BPF and the PSA. Analyses the role of the nominated subcontractor during a building project and his relationship with the main contractor.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS23456 (Browse shelf(Opens below)) 1 Available 17116-1001

Reviews the system of nomination in building contracts, which is being challenged increasingly by clients. Notes the views of the BPF and the PSA. Analyses the role of the nominated subcontractor during a building project and his relationship with the main contractor.