Government welcomes cleaner coal technology
Series: DTI Press Release ; (P/2004/032) 21 January 2004 (1)Publication details: 2004Subject(s): Summary: Government approved a proposal from Rugeley Power Ltd to fit a flue gas desulphurisation (FGD) plant at Rugeley power station in Staffordshire. The new plant will have a dual role. The FGD plant will be designed and operated as a chemical absorption process. Injection of a limestone slurry will remove over 90% of the suphur dioxide from the gases and produce de-sulpho gypsum which is used in the construction industry. http://www.gnn.gov.uk/gnn/national.nsf/Daily+News/ EFC0B057884D474280256E22003A8894?opendocument.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB4003-07 (Browse shelf(Opens below)) | 1 | Available | 124885-1001 |
Government approved a proposal from Rugeley Power Ltd to fit a flue gas desulphurisation (FGD) plant at Rugeley power station in Staffordshire. The new plant will have a dual role. The FGD plant will be designed and operated as a chemical absorption process. Injection of a limestone slurry will remove over 90% of the suphur dioxide from the gases and produce de-sulpho gypsum which is used in the construction industry. http://www.gnn.gov.uk/gnn/national.nsf/Daily+News/ EFC0B057884D474280256E22003A8894?opendocument.