Image from Google Jackets

Government welcomes cleaner coal technology

Series: DTI Press Release ; (P/2004/032) 21 January 2004 (1)Publication details: 2004Subject(s): Summary: Government approved a proposal from Rugeley Power Ltd to fit a flue gas desulphurisation (FGD) plant at Rugeley power station in Staffordshire. The new plant will have a dual role. The FGD plant will be designed and operated as a chemical absorption process. Injection of a limestone slurry will remove over 90% of the suphur dioxide from the gases and produce de-sulpho gypsum which is used in the construction industry. http://www.gnn.gov.uk/gnn/national.nsf/Daily+News/ EFC0B057884D474280256E22003A8894?opendocument.
Holdings
Item type Current library Call number Copy number Status Barcode
News article London News article WB4003-07 (Browse shelf(Opens below)) 1 Available 124885-1001

Government approved a proposal from Rugeley Power Ltd to fit a flue gas desulphurisation (FGD) plant at Rugeley power station in Staffordshire. The new plant will have a dual role. The FGD plant will be designed and operated as a chemical absorption process. Injection of a limestone slurry will remove over 90% of the suphur dioxide from the gases and produce de-sulpho gypsum which is used in the construction industry. http://www.gnn.gov.uk/gnn/national.nsf/Daily+News/ EFC0B057884D474280256E22003A8894?opendocument.