Pipelines and pumping stations
Language: English Series: CSM (Chartered Surveyor Monthly) ; 3(9) June 1994, 33(1)Publication details: 1994Subject(s):- CIVIL ENGINEERING STANDARD METHOD OF MEASUREMENT (SECOND EDITION)
- CIVIEL ENGINEERING STANDARD METHOD OF MEASUREMENT (THIRD EDITION)
- CIVIL ENGINEERING PROJECTS
- ICE CONDITIONS OF CONTRACT (SIXTH EDITION)
- SEWERAGE TREATMENT WORKS
- SOUTH WEST WATER
- TEIGN ESTUARY
- TEIGNBRIDGE DC
- BUILDING AND CONSTRUCTION-PROJECTS
| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | X1556 (Browse shelf(Opens below)) | 1 | Available | 17702-1001 |
Describes the £45m South West Water Teign estuary sewerage treatment scheme where quantity surveyors are involved in civil engineering projects. Looks at the construction of the pipelines, pumping stations, pressure pipes, and ductile iron pipework.