Retention of major facades
Language: English Series: Structural Engineer ; 67(8) 18 April 1989, 131-138(8)Publication details: 1989Subject(s): Summary: Detailed review of the refurbishment of buildings, maintaining the facade describing the various stages of the design development and giving detailed information on the key factors to be considered from the preliminary investigations, through the onsite installation of temporary works and the construction of the new building behind the facade.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS40585 (Browse shelf(Opens below)) | 1 | Available | 24870-1001 |
Detailed review of the refurbishment of buildings, maintaining the facade describing the various stages of the design development and giving detailed information on the key factors to be considered from the preliminary investigations, through the onsite installation of temporary works and the construction of the new building behind the facade.