Move to beat cowboy consultants
Language: English Series: Construction News ; no 6082, 6/10/88 p1Publication details: 1988Subject(s): Summary: The Association of Metropolitan Authorities is drafting a model contract compliance questionnaire for architects and civil engineers tendering for local authority work to ensure that the authorities do not get landed with "cowboy" consultants .| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB2440-03 (Browse shelf(Opens below)) | 1 | Available | 42612-1001 |
The Association of Metropolitan Authorities is drafting a model contract compliance questionnaire for architects and civil engineers tendering for local authority work to ensure that the authorities do not get landed with "cowboy" consultants .