Guide to IPC gives new details on appeals, phase-in timetable
Language: English Series: ENDS Report ; (193) February 1991, 29-31 (3)Publication details: 1991Subject(s): Summary: A DOE guide " Integrated pollution control " provides practical guidance on IPC procedures implemented in England and Wales from 1 April 1991 by HM Inspectorate of Pollution . Allocation of processes between central and local control, application details, transitional arrangements, appeal procedures and variation procedures are among the main issues explained. Guidelines available from DOE.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS44246 (Browse shelf(Opens below)) | 1 | Available | 46106-1001 |
A DOE guide " Integrated pollution control " provides practical guidance on IPC procedures implemented in England and Wales from 1 April 1991 by HM Inspectorate of Pollution . Allocation of processes between central and local control, application details, transitional arrangements, appeal procedures and variation procedures are among the main issues explained. Guidelines available from DOE.