Construction contractor`s claims analysis: an integrated system approach
Language: English Series: Building ; Research and Information 19(1) January-February 19Subject(s): Summary: Introduced here is an integrated computerised system designed to analyse construction contractors claims arising from delays. Categorises the types of delay and the consequent claims, before reviewing the analysis procedure. The computer model designed to replace existing methods is described, with flow diagrams as illustration.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS44492 (Browse shelf(Opens below)) | 1 | Available | 47472-1001 |
Introduced here is an integrated computerised system designed to analyse construction contractors claims arising from delays. Categorises the types of delay and the consequent claims, before reviewing the analysis procedure. The computer model designed to replace existing methods is described, with flow diagrams as illustration.