Laing avoids small PFI projects
Language: English Series: Daily Telegraph ; 31 July 1996, 25(1)Publication details: 1996Subject(s): Summary: The John Laing building group has stopped involvement in small PFI schemes because of the high cost of tendering.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB3230-20 (Browse shelf(Opens below)) | 1 | Available | 64495-1001 |
The John Laing building group has stopped involvement in small PFI schemes because of the high cost of tendering.