Image from Google Jackets

Laing avoids small PFI projects

Language: English Series: Daily Telegraph ; 31 July 1996, 25(1)Publication details: 1996Subject(s): Summary: The John Laing building group has stopped involvement in small PFI schemes because of the high cost of tendering.
Holdings
Item type Current library Call number Copy number Status Barcode
News article London News article WB3230-20 (Browse shelf(Opens below)) 1 Available 64495-1001

The John Laing building group has stopped involvement in small PFI schemes because of the high cost of tendering.