Cladding guide is deficient
Language: English Series: Building ; 257(7761) 11 September 1992, 10(1)Publication details: 1992Subject(s): Summary: A leading cladding consultant has warned that the long awaited new curtain walling standard will lower standards rather than raise them if it is adopted by the industry in its present form. The final draft has been issued this week. Other cladding consultants are predicting a rise in cladding problems caused by the inclusion of nickel sulphide in glass.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB2835-13 (Browse shelf(Opens below)) | 1 | Available | 6857-1001 |
A leading cladding consultant has warned that the long awaited new curtain walling standard will lower standards rather than raise them if it is adopted by the industry in its present form. The final draft has been issued this week. Other cladding consultants are predicting a rise in cladding problems caused by the inclusion of nickel sulphide in glass.