Image from Google Jackets

Fast cast

By: Language: English Series: Building ; 252(29) 17 July 1987, 68(1)Publication details: 1987Subject(s): Summary: Reports on the fast track construction of the West World office development at Hangar Lane in west London . John Laing has completed the structural frame of the 10-storey office block in just 22 weeks; achieved by a combination of traditional decking and flying forms. Compares this project with the Broadgate scheme by Bovis .
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS37916 (Browse shelf(Opens below)) 1 Available 7601-1001

Reports on the fast track construction of the West World office development at Hangar Lane in west London . John Laing has completed the structural frame of the 10-storey office block in just 22 weeks; achieved by a combination of traditional decking and flying forms. Compares this project with the Broadgate scheme by Bovis .