Design and build: trojan horse or gift horse for the QS consultancy?
Language: English Series: CSM (Chartered Surveyor Monthly) ; 3(6) March 1994, 38-39(2)Publication details: 1994Subject(s): Summary: Assesses the impact of the emergence of design and build contracts on the consultant quantity surveying practice.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS50237 (Browse shelf(Opens below)) | 1 | Available | 74759-1001 |
Assesses the impact of the emergence of design and build contracts on the consultant quantity surveying practice.