Image from Google Jackets

Five-year guarantees for all projects urged

Language: English Series: Contract Journal ; 360 (5842) 10 October 1991, 1(1)Publication details: 1991Subject(s): Summary: A draft EC directive proposes a mandatory five year latent defects insurance on all construction work fron 1993. The new regime would mean an end to collateral warranties and bank guarantees.
Holdings
Item type Current library Call number Copy number Status Barcode
News article London News article WB2739-07 (Browse shelf(Opens below)) 1 Available 8001-1001

A draft EC directive proposes a mandatory five year latent defects insurance on all construction work fron 1993. The new regime would mean an end to collateral warranties and bank guarantees.