R v Bolton MBC
Language: English Series: New Property Cases ; [1998] NPC 80, (2)Publication details: 1998Subject(s): Summary: CA 5 May 1998. The CA agrees that a planning authority can rely very heavily on the Environment Agency in allowing details of environmental control to be handled by the agency`s authorisation process, when granting planning permission to build a major waste incinerator. (Taken from report header). NOT TO BE PHOTOCOPIED.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Law report | London Journal article | X91692 (Browse shelf(Opens below)) | 1 | Available | 86186-1001 |
CA 5 May 1998. The CA agrees that a planning authority can rely very heavily on the Environment Agency in allowing details of environmental control to be handled by the agency`s authorisation process, when granting planning permission to build a major waste incinerator. (Taken from report header). NOT TO BE PHOTOCOPIED.