Image from Google Jackets

The five commandments of construction project delay analysis

By: Language: English Series: Cost Engineering ; 40(4) April 1998, 37-41(5)Publication details: 1998Subject(s): Summary: Presents a formal procedure to follow in the analysis of why a delay has occurred on a construction project. Suggests methods of data gathering and analysis, identification of the root cause, classification of the type of delay, and assignment of responsibility.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS58785 (Browse shelf(Opens below)) 1 Available 86252-1001

Presents a formal procedure to follow in the analysis of why a delay has occurred on a construction project. Suggests methods of data gathering and analysis, identification of the root cause, classification of the type of delay, and assignment of responsibility.