Why make the contractor go bust?
Language: English Series: Architect and Surveyor ; 62(4) August/September 1987, 16(1)Publication details: 1987Subject(s): Summary: Discusses retention funds on building contracts; attempts to equate the level of retention to the level of risk falling on the client. Covers risk during the contract period, risk during the making good of defects and reducing retention.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS38140 (Browse shelf(Opens below)) | 1 | Available | 8891-1001 |
Discusses retention funds on building contracts; attempts to equate the level of retention to the level of risk falling on the client. Covers risk during the contract period, risk during the making good of defects and reducing retention.