The wash-and-go treatment
Language: English Series: Construction News ; (6574) 16 July 1998, 22-23(2)Publication details: 1998Subject(s): Summary: Reviews the site reclamation project at the Basford Gasworks in Nottingham which is using the technique of soil washing.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS59037 (Browse shelf(Opens below)) | 1 | Available | 87564-1001 |
Reviews the site reclamation project at the Basford Gasworks in Nottingham which is using the technique of soil washing.