Image from Google Jackets

Calculation of losses

By: Language: English Series: Construction News ; (6574) 16 July 1998, 26(1)Publication details: 1998Subject(s): Summary: Considers the calculation of damages for overhead losses incurred in contract works.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS58990 (Browse shelf(Opens below)) 1 Available 87568-1001

Considers the calculation of damages for overhead losses incurred in contract works.