Speeding up arbitration

By: Language: English Series: Construction News ; (6601) 4 February 1999, 20(1)Publication details: 1999Subject(s): Summary: Summarises the main points of the case "Redland Aggregates v Shepherd Hill" which related to the dispute procedure of the FCEC Blue form of subcontract. Under this procedure, if any dispute arises in connection with the main contract which concerns the subcontract works, the contractor may require the dispute to be dealt with jointly with the dispute under the main contract. The contract does not, however, impose any timetable on the contractor to invoke arbitration. CA ruled that if the contractor is unwilling to bring about a tripartite arbitration, the subcontractor may proceed with an arbitration against the contractor only.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS59875 (Browse shelf(Opens below)) 1 Available 91139-1001

Summarises the main points of the case "Redland Aggregates v Shepherd Hill" which related to the dispute procedure of the FCEC Blue form of subcontract. Under this procedure, if any dispute arises in connection with the main contract which concerns the subcontract works, the contractor may require the dispute to be dealt with jointly with the dispute under the main contract. The contract does not, however, impose any timetable on the contractor to invoke arbitration. CA ruled that if the contractor is unwilling to bring about a tripartite arbitration, the subcontractor may proceed with an arbitration against the contractor only.