Construction resource/method factors influencing productivity for high rise concrete construction
Series: Construction Management and Economics ; 17(5) September 1999, 577-587(11)Publication details: 1999Subject(s): Summary: Research among European countries confirms variances in productivity rates given by construction planning engineers for identical operations, and similar differences in construction resource/method factors. Analysis of data taken from French, German and UK contractors. References.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Books | ABS61448 (Browse shelf(Opens below)) | 1 | Available | 100471-1001 |
Research among European countries confirms variances in productivity rates given by construction planning engineers for identical operations, and similar differences in construction resource/method factors. Analysis of data taken from French, German and UK contractors. References.