Production rates for international projects in Asia
Series: Cost Engineering ; 41(8) August 1999, 38-44(7)Publication details: 1999Subject(s): Summary: Compares the labour needs for building construction in a developing country, Bangladesh, with those in a wealthy country, the US. The major costs of a construction project are linked to material, labour, and equipment.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS61326 (Browse shelf(Opens below)) | 1 | Available | 100552-1001 |
Compares the labour needs for building construction in a developing country, Bangladesh, with those in a wealthy country, the US. The major costs of a construction project are linked to material, labour, and equipment.