Image from Google Jackets

Better project performance

Series: Contract Journal ; 8 December 1999, 1(1)Publication details: 1999Subject(s): Summary: A survey of government projects using traditional procurement methods indicates that there has been an improvement in performance, with a reduction in time and cost overruns.
Holdings
Item type Current library Call number Copy number Status Barcode
News article London News article WB3549-07 (Browse shelf(Opens below)) 1 Available 103114-1001

A survey of government projects using traditional procurement methods indicates that there has been an improvement in performance, with a reduction in time and cost overruns.