Better project performance
Series: Contract Journal ; 8 December 1999, 1(1)Publication details: 1999Subject(s): Summary: A survey of government projects using traditional procurement methods indicates that there has been an improvement in performance, with a reduction in time and cost overruns.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB3549-07 (Browse shelf(Opens below)) | 1 | Available | 103114-1001 |
A survey of government projects using traditional procurement methods indicates that there has been an improvement in performance, with a reduction in time and cost overruns.