Image from Google Jackets

Whole-life cost model

By: Series: Building ; 265(8140) 9 June 2000, 58-61(4)Publication details: 2000Subject(s): Summary: Looks at how developers are reducing the whole-life costs of running industrial buildings in order to attract potential tenants. Table of capital, and maintenance costs for a typical 4000msq industrial unit. Case study of Wednesbury One, West Midlands, and Junction Six, Birmingham.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS62411 (Browse shelf(Opens below)) 1 Available 106567-1001

Looks at how developers are reducing the whole-life costs of running industrial buildings in order to attract potential tenants. Table of capital, and maintenance costs for a typical 4000msq industrial unit. Case study of Wednesbury One, West Midlands, and Junction Six, Birmingham.