Avoiding the effects of an adverse decision

By: Series: Contract Journal ; 405(6290) 16 August 2000, 23(1)Publication details: 2000Subject(s): Summary: Discusses the case of "ABB Power Construction Ltd v Norwest Holst Engineering". At issue was the definition of works within the ambit of the Construction Act 1996 s105(2). The court held that the exempt construction operations defined within s105(2) should be defined by reference to the nature of the project as a whole.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS62684 (Browse shelf(Opens below)) 1 Available 108006-1001

Discusses the case of "ABB Power Construction Ltd v Norwest Holst Engineering". At issue was the definition of works within the ambit of the Construction Act 1996 s105(2). The court held that the exempt construction operations defined within s105(2) should be defined by reference to the nature of the project as a whole.