Image from Google Jackets

King`s Cross decision next autumn

Language: English Series: Independent ; 28/11/89 p8 | Financial Times ; 28/11/89 p8 (2)Publication details: 1989Subject(s): Summary: A decision on developing a Channel tunnel terminal at King`s Cross has been postponed until autumn 1990; it is expected that the terminal bill will be considered at the same time as the bill concerning the Channel tunnel rail link .
Holdings
Item type Current library Call number Copy number Status Barcode
News article London News article WB2547-27 (Browse shelf(Opens below)) 1 Available 10415-1001

A decision on developing a Channel tunnel terminal at King`s Cross has been postponed until autumn 1990; it is expected that the terminal bill will be considered at the same time as the bill concerning the Channel tunnel rail link .