No time to lose
Series: Building ; 265(8166) 15 December 2000, 71(1)Publication details: 2000Subject(s): Summary: Looks at the increasing risk contractors must bear on PFI projects with heavy liability for delays. Contractors should be aware of restrictions on the type of delay events for which they can claim; they should also ensure that the greater risk is reflected in the contract price and that they should consider extra insurance on top of their usual all-risks policy.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS63265 (Browse shelf(Opens below)) | 1 | Available | 110301-1001 |
Looks at the increasing risk contractors must bear on PFI projects with heavy liability for delays. Contractors should be aware of restrictions on the type of delay events for which they can claim; they should also ensure that the greater risk is reflected in the contract price and that they should consider extra insurance on top of their usual all-risks policy.