Clobbered from the start

By: Series: Building ; 266(8191) 29 June 2001, 50(1)Publication details: 2001Subject(s): Summary: Looks at the problems associated with novation clauses in fixed-price design and build contracts where, as in "Blyth and Blyth v Carillion Construction Ltd", the contractor can suffer losses as a result of the mistakes made by the consultant before the contract was signed.