Image from Google Jackets

A better way to sort out delays

By: Series: Construction News ; (6748) 10 January 2002, 12(1)Publication details: 2002Subject(s): Online resources: Summary: Discusses the draft protocol for determining extensions of time and compensation for delay and disruption produced by the Society of Construction Law. Considers the aim of the protocol to provide guidance to all parties involved in a dispute over matters of timing. The protocol concentrates on the programme, which is always under scrutiny when there are disputes over delay or disruption. The protocol is available to download from www.eotprotocol.com.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS65022 (Browse shelf(Opens below)) 1 Available 116662-1001

Discusses the draft protocol for determining extensions of time and compensation for delay and disruption produced by the Society of Construction Law. Considers the aim of the protocol to provide guidance to all parties involved in a dispute over matters of timing. The protocol concentrates on the programme, which is always under scrutiny when there are disputes over delay or disruption. The protocol is available to download from www.eotprotocol.com.