Image from Google Jackets

Events, dear boy, events

By: Contributor(s): Series: Building ; 267(8230) 19 April 2002, 54-55(2)Publication details: 2002Subject(s): Summary: Considers draft delay protocol, produced by Society of Construction Law, which proposes that a contract administrator should determine impact of a delay.
Holdings
Item type Current library Copy number Status Barcode
Journal article London Journal article 1 Available 118493-1001

Considers draft delay protocol, produced by Society of Construction Law, which proposes that a contract administrator should determine impact of a delay.