The EC Harris/"Construction News" Contractors' input cost index
Series: Construction News ; (6784) 19 September 2002, 15(1)Publication details: 2002Subject(s): Summary: The index shows for the first time in five years, materials prices have grown almost as fast as labour costs. Contractors' input costs in the UK rose by 7.2% on average in the year to September 2002, while labour rates rose 8.6% and material costs were 6.2% higher. Graphs. Table.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS66009 (Browse shelf(Opens below)) | 1 | Available | 120197-1001 |
The index shows for the first time in five years, materials prices have grown almost as fast as labour costs. Contractors' input costs in the UK rose by 7.2% on average in the year to September 2002, while labour rates rose 8.6% and material costs were 6.2% higher. Graphs. Table.