Image from Google Jackets

Professional indemnity insurers have cause for concern

By: Series: Civil Engineering Surveyor ; October 2002, 20-21(2)Publication details: 2002Subject(s): Summary: Discusses two recent construction cases relating to adjudication. In "Gillies Ramsay Diamond v PJW Enterprises Ltd" the employer PJW Enterprises claimed that the contract administrator Gillies Ramsay Diamond had failed to exercise the level of skill expected of a competent surveyor (as covered by the Construction Act 1996) and as a result PJW incurred losses. The matter was referred to adjudication and Gillies argued that the dispute fell outside the provisions of the Construction Act. The dispute finished in the Outer House Court of Session which found in favour of PJW, but PJW still suffered loss because the dispute had not been resolved at adjudication. Also looks at "J T Mackley v Gosport Marina Ltd" in which a dispute was referred to court over the validity of a Notice to Refer. The decision went in favour of the contractor Mackley and the threat of arbitration was removed. Concludes that if a contract states that an action must be carried out within a timescale, parties must ensure that the timescale is followed.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS66007 (Browse shelf(Opens below)) 1 Available 120347-1001

Discusses two recent construction cases relating to adjudication. In "Gillies Ramsay Diamond v PJW Enterprises Ltd" the employer PJW Enterprises claimed that the contract administrator Gillies Ramsay Diamond had failed to exercise the level of skill expected of a competent surveyor (as covered by the Construction Act 1996) and as a result PJW incurred losses. The matter was referred to adjudication and Gillies argued that the dispute fell outside the provisions of the Construction Act. The dispute finished in the Outer House Court of Session which found in favour of PJW, but PJW still suffered loss because the dispute had not been resolved at adjudication. Also looks at "J T Mackley v Gosport Marina Ltd" in which a dispute was referred to court over the validity of a Notice to Refer. The decision went in favour of the contractor Mackley and the threat of arbitration was removed. Concludes that if a contract states that an action must be carried out within a timescale, parties must ensure that the timescale is followed.