By: Series: Contract Journal ; 417(6410) 22 January 2003, 21(1)Publication details: 2003Subject(s): Summary: Considers disputes about changes of scope under design and build contracts, with reference to "Skanska Construction UK Ltd v Egger (Barony) Ltd" (CA [2002] 83 ConLR 132-144) Concludes that attention is needed in the preparation of employers' requirements and in the management of design review procedures to avoid disputes about the scope of works under design and construct contracts. View judgment at www.courtservice.gov.uk.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS66309 (Browse shelf(Opens below)) 1 Available 121293-1001

Considers disputes about changes of scope under design and build contracts, with reference to "Skanska Construction UK Ltd v Egger (Barony) Ltd" (CA [2002] 83 ConLR 132-144) Concludes that attention is needed in the preparation of employers' requirements and in the management of design review procedures to avoid disputes about the scope of works under design and construct contracts. View judgment at www.courtservice.gov.uk.