Working with confidence
Language: English Series: Contract Journal ; 383(6068) 30(1)Publication details: 1996Subject(s): Summary: Suggests that wider adoption of the guaranteed maximum price concept and contractors engaging claims consultants on a contingent basis would reduce the need for expensive claim proceedings.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS54650 (Browse shelf(Opens below)) | 1 | Available | 11518-1001 |
Suggests that wider adoption of the guaranteed maximum price concept and contractors engaging claims consultants on a contingent basis would reduce the need for expensive claim proceedings.