Image from Google Jackets

Working with confidence

By: Language: English Series: Contract Journal ; 383(6068) 30(1)Publication details: 1996Subject(s): Summary: Suggests that wider adoption of the guaranteed maximum price concept and contractors engaging claims consultants on a contingent basis would reduce the need for expensive claim proceedings.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS54650 (Browse shelf(Opens below)) 1 Available 11518-1001

Suggests that wider adoption of the guaranteed maximum price concept and contractors engaging claims consultants on a contingent basis would reduce the need for expensive claim proceedings.