Recovery rate
Series: New Civil Engineer ; 18 November 2004, 27(1)Publication details: 2004Subject(s): Summary: Reports on the new ICE Demolition Protocol which aims to minimise construction waste by mapping out how materials can be recovered from demolition and specified in new building projects.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS68586 (Browse shelf(Opens below)) | 1 | Available | 128300-1001 |
Reports on the new ICE Demolition Protocol which aims to minimise construction waste by mapping out how materials can be recovered from demolition and specified in new building projects.