Image from Google Jackets

Reasonableness of settlements revisited

By: Language: English Series: Construction Law Journal ; 21(3) 2005, 216-221(6)Publication details: 2005Subject(s): Summary: Discusses, with reference to the two linked cases of "Bovis Lend Lease Ltd v RD Fire Protection Ltd and Huthco Ltd and another v Bovis Lend Lease Ltd" ([2003] EWHC 939 (TCC), unreported) the problems that can occur when several parties in construction projects find themselves subject to a claim. In this complex situation it is often not possible to resolve all disputes with all parties simultaneously. The parties may reach a wrap up deal without necessarily referring to the precise allocation within a settlement.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L129938 (Browse shelf(Opens below)) 1 Available 129938-1001

Discusses, with reference to the two linked cases of "Bovis Lend Lease Ltd v RD Fire Protection Ltd and Huthco Ltd and another v Bovis Lend Lease Ltd" ([2003] EWHC 939 (TCC), unreported) the problems that can occur when several parties in construction projects find themselves subject to a claim. In this complex situation it is often not possible to resolve all disputes with all parties simultaneously. The parties may reach a wrap up deal without necessarily referring to the precise allocation within a settlement.