JCT standard forms of building contract, 2005 editions part 1
Language: English Series: International Construction Law Review[v1(126) January 2006, 90-101(12)Publication details: 2006Subject(s): Summary: Summarises the overall changes to the JCT suite of contracts and contains a detailed analysis of the changes to the JCT Standard Form of Building Contract (2005 Edition). Discusses sub-contracting, sub-letting terms, the contractor's obligations, contractor design, insurance, timing, payment, warranties and third party rights, termination, and dispute resolution. Argues that the changes have resulted in a more manageable document, which is likely to be more popular than its predecessor.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | L132396 (Browse shelf(Opens below)) | 1 | Available | 132396-1001 |
Summarises the overall changes to the JCT suite of contracts and contains a detailed analysis of the changes to the JCT Standard Form of Building Contract (2005 Edition). Discusses sub-contracting, sub-letting terms, the contractor's obligations, contractor design, insurance, timing, payment, warranties and third party rights, termination, and dispute resolution. Argues that the changes have resulted in a more manageable document, which is likely to be more popular than its predecessor.