Dates are key in the New Engineering Contract
Language: English Series: Contract Journal ; 432(6566) 15 March 2006, 42(1)Publication details: 2006Subject(s): Summary: Advises on the selection of appropriate procurement options in the third edition of the NEC, and then looks at the introduction of key dates which allow the employer to identify conditions that have to be met by specified times, and the costs recoverable if a contractor fails to achieve these.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | L132956 (Browse shelf(Opens below)) | 1 | Available | 132956-1001 |
Advises on the selection of appropriate procurement options in the third edition of the NEC, and then looks at the introduction of key dates which allow the employer to identify conditions that have to be met by specified times, and the costs recoverable if a contractor fails to achieve these.