Image from Google Jackets

Want your money back?

By: Language: English Series: Building ; 271(8428) 28 April 2006, 54-55(2)Publication details: 2006Subject(s): Summary: Considers ways of recovering bidding costs in PFI schemes, especially where no contractual right exists in a preferred bidder letter. A successful claim at common law could be brought on the basis that the other party had received a benefit, or that a cause of action had accrued at preferred bidder stage, or that a negligent mis-statement had led to economic loss.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L133372 (Browse shelf(Opens below)) 1 Available 133372-1001

Considers ways of recovering bidding costs in PFI schemes, especially where no contractual right exists in a preferred bidder letter. A successful claim at common law could be brought on the basis that the other party had received a benefit, or that a cause of action had accrued at preferred bidder stage, or that a negligent mis-statement had led to economic loss.