Why third-party rights don't work
Language: English Series: Building ; 271(8453) 27 October 2006, 54(1)Publication details: 2006Subject(s): Summary: Debates the inclusion of the third-party rights schedule (sched 5) in the JCT Standard Building Contract (2005 Edition). Argues that there are so many problems with the third-party rights option, such as the failure to include a mandatory requirement for a contractor's professional indemnity insurance cover, that collateral warranties will still be insisted on.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | L135551 (Browse shelf(Opens below)) | 1 | Available | 135551-1001 |
Debates the inclusion of the third-party rights schedule (sched 5) in the JCT Standard Building Contract (2005 Edition). Argues that there are so many problems with the third-party rights option, such as the failure to include a mandatory requirement for a contractor's professional indemnity insurance cover, that collateral warranties will still be insisted on.