Image from Google Jackets

The painful upbringing of building schools for the future

By: Language: English Series: Building ; 273(8546) 12 September 2008, 38-44(7)Publication details: 2008Subject(s): Summary: The first in a series of six articles on school developments (see other articles under references L145344, L145345, L145349, L145354, L145360). Reports current progress to the Building Schools for the Future (BSF) governmental programme. Shows that the aim is to improve the quality of project by having the Commission for Architecture and the Built Environment involved during the design process, and increase the speed of school development and delivery. Lists the 30 best BSF contractors and the 89 schools still open to bids.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L145210 (Browse shelf(Opens below)) 1 Available 145210-1001

The first in a series of six articles on school developments (see other articles under references L145344, L145345, L145349, L145354, L145360). Reports current progress to the Building Schools for the Future (BSF) governmental programme. Shows that the aim is to improve the quality of project by having the Commission for Architecture and the Built Environment involved during the design process, and increase the speed of school development and delivery. Lists the 30 best BSF contractors and the 89 schools still open to bids.