Image from Google Jackets

Carillion advances to front after string of military victories

By: Language: English Series: Building ; 273 (8551) 17 October 2008, 20-21 (2) Publication details: 2008Subject(s): Summary: Presents busines barometer data on top contractors for the month of September 2008. Reports that Carillion is still at the top of table thanks to four contrats with the Royal School of Military Engineering. Presents tables of top contractors with their number of projects and their total value in millions of pounds. Gives tables of top contractors excluding and including civils; top architects; top clients/promoters; top quantity surveyors; and tables of yearly work won.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L145617 (Browse shelf(Opens below)) 1 Available 145617-1001

Presents busines barometer data on top contractors for the month of September 2008. Reports that Carillion is still at the top of table thanks to four contrats with the Royal School of Military Engineering. Presents tables of top contractors with their number of projects and their total value in millions of pounds. Gives tables of top contractors excluding and including civils; top architects; top clients/promoters; top quantity surveyors; and tables of yearly work won.