Orders for new construction

Language: English Series: DOE Information Bulletin ; (202) 24 March 1993(10)Publication details: (202) 24 March 1993(10)Subject(s): Summary: In the three months between November 1992 and January 1993 total orders received by contractors for construction work were 4% higher than in the previous three months but 1% lower than in the period November 1991 to January 1992.
Holdings
Item type Current library Call number Copy number Status Barcode
News article London News article WB2912-05 (Browse shelf(Opens below)) 1 Available 12708-1001

In the three months between November 1992 and January 1993 total orders received by contractors for construction work were 4% higher than in the previous three months but 1% lower than in the period November 1991 to January 1992.