Image from Google Jackets

Output slump puts pressure on input costs

By: Language: English Series: Construction News ; (7111) 2 April 2009, 18-19 (2)Publication details: 2009Subject(s): Summary: Reports on construction costs for March 2009. Explains that contractors' input costs are 4.9% lower over the last three months. Material costs fell by 5.6%. Labour costs decreased by 3.7% on average. Provides costs of construction: mean materials and labour prices for March 2009.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L147205 (Browse shelf(Opens below)) 1 Available 147205-1001

Reports on construction costs for March 2009. Explains that contractors' input costs are 4.9% lower over the last three months. Material costs fell by 5.6%. Labour costs decreased by 3.7% on average. Provides costs of construction: mean materials and labour prices for March 2009.