Lead times April-June 2009

By: Language: English Series: Building ; 274(8536) 3 July 2009, 54-55(2)Publication details: 2009Subject(s): Summary: Lead Times have fallen in six works packages and have not increased in any other area. Concrete works showed signs of levelling out at nine weeks and cladding remains at record low levels of 21 weeks for the third quarter running. Gives further details of lead times for various products including piling, concrete works, structural steel frames, cladding and roofing.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L148658 (Browse shelf(Opens below)) 1 Available 148658-1001

Lead Times have fallen in six works packages and have not increased in any other area. Concrete works showed signs of levelling out at nine weeks and cladding remains at record low levels of 21 weeks for the third quarter running. Gives further details of lead times for various products including piling, concrete works, structural steel frames, cladding and roofing.