Image from Google Jackets

Kier maintains its lead with £110m Barnsley council deal

By: Language: English Series: Building ; 274 (8609) 11 December 2009, 16-17(2)Publication details: 2009Subject(s): Summary: Business barometer data on contracts with a value of £100 000 or above in November 2009. Kier came top of the table for the third month in a row. Total work won by the top 30 contractors was about a third down on October.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L149492 (Browse shelf(Opens below)) 1 Available 149492-1001

Business barometer data on contracts with a value of £100 000 or above in November 2009. Kier came top of the table for the third month in a row. Total work won by the top 30 contractors was about a third down on October.