Lead times July-September 2009

By: Language: English Series: Building ; 275 (8615) 5 February 2010, 52-53 (2)Publication details: 2010Subject(s): Summary: Gives lead times for various products including piling, curtain walling and drylining. Many of the products have stayed level during this period but some including structural steel frames and concrete works have fallen. Once again none of the products have increased their lead times.