Image from Google Jackets

Power up for level 3

By: Language: English Series: Building ; 280(8870) 17 April 2015, 32-34 (3)Subject(s): Summary: The strategy document for BIM Level 3- Digital Built Britain has arrived and is reviewed and critiqued by the Building team.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journals L158649 (Browse shelf(Opens below)) 1 Available 158649-1001

The strategy document for BIM Level 3- Digital Built Britain has arrived and is reviewed and critiqued by the Building team.