Image from Google Jackets

Definition of prime cost of daywork carried out under a heating, ventilation, air conditioning, refrigeration, pipework and/or domestic engineering contract

By: Contributor(s): Language: English Series: RICS Guidance NotePublication details: London RICS 1980Edition: 2nd edDescription: 8p. 21cmISBN:
  • 0854061223
Subject(s): LOC classification:
  • 692.8 $2 18
Holdings
Item type Current library Call number Copy number Status Barcode
Book London RICS Boxes RICS 1980/24 (Browse shelf(Opens below)) 4 Available 30073028
Book London RICS Boxes RICS 1980/24 (Browse shelf(Opens below)) 3 Available 30016543
Reference material London RICS Boxes RICS 1980/24 (Browse shelf(Opens below)) 2 Available 30026604
Reference material London RICS Boxes RICS 1980/24 (Browse shelf(Opens below)) 1 Available 30016539